Tag Archives: Surveyor 6

[January 24, 1968] On Track for the Moon (Apollo 5 and Surveyor 7]




by Kaye Dee

As we approach the first anniversary of the shocking loss of the crew of Apollo 1, the success of the recent Apollo 5 mission reminds us that the spirit of Grissom, White and Chaffee lives on as NASA continues developing and testing the technology to make a manned lunar landing a reality.

Apollo 1's Legacy
Although the fire that engulfed Apollo 1 and killed its crew destroyed its Command Module, the accident took place on the launchpad during a launch simulation, and fortunately the Saturn IB booster intended to loft that mission into orbit remained undamaged. Because that AS-204 vehicle was the last Saturn IB with full research and development instrumentation, NASA decided that this rocket would be re-assigned to Apollo 5, the much-delayed first test flight of the Lunar Module – the spacecraft essential for successfully landing astronauts on the Moon – while manned Apollo missions continue on hold.

From LEM to LM
The spacecraft we now call the Lunar Module (LM) became part of the Apollo programme in 1962, when NASA decided to adopt the technique of lunar orbit rendezvous (LOR) for its Moon landing missions. First proposed in 1919 by Ukrainian engineer and mathematician Yuri Kondratyuk, the LOR technique uses two spacecraft that travel together to the Moon and then separate in lunar orbit, with a lander carrying astronauts from orbit to the Moon’s surface. The LOR method allows the use of a smaller and lighter lander than the large, all-on-one spacecraft originally proposed for Apollo, and also provides for greater flexibility in landing site selection.

An early diagram comparing the size of a lunar landing vehicle using the Direct Ascent method of reaching the Moon and a LOR lunar excursion vehicle

The version of lunar orbit rendezvous suggested to NASA by engineer John C. Houbolt called for a landing vehicle consisting of two parts: a landing stage, that would accomplish the descent from orbit and remain on the Moon’s surface, and an ascent stage that would carry the astronauts back to the main spacecraft in orbit. This design gave us the Command Service Module as the Moon orbiting spacecraft, and what was originally called the Lunar Excursion Module (LEM, pronounced as a word, not as the individual letters) as the vehicle that would land astronauts on the Moon.

Dr. Houbolt illustrating the main spacecraft needed for his Lunar Orbit Rendezvous proposal for the Apollo programme

In June 1966, NASA changed the name to Lunar Module (LM), eliminating the word “excursion”. My friends at the WRE tell me that this was because there were concerns that using “excursion” might make it sound like the lunar missions were frivolous, and so reduce support for the Apollo programme! Despite the official name change, the astronauts, as well as staff at Grumman, still call it “the lem”, which certainly feels easier to say.

Delays…Delays…
However, the two-stage LEM/LM has proved much harder to develop and manufacture than the contractor Grumman originally anticipated, because of the complexity and level of reliability required of the hardware. Originally, NASA planned for the automated test flight of LM-1, the first Lunar Module, to occur in April 1967, but the delivery of the spacecraft was repeatedly delayed: the two stages of LM-1 did not arrive at Cape Kennedy until late June last year.

The separately-crated stages of LM-1 arriving at Kennedy Space Centre on board a Super Guppy cargo plane. The stages were mated to each other four days later

A team of 400 engineers and technicians then checked out the spacecraft to ensure that it met specifications. The discovery of leaks in the ascent stage propulsion system meant that the ascent and descent stages were demated and remated multiple times for repairs between August and October. LM-1 was finally mounted on its Saturn IB booster on 19 November and a launch date was set for the latter part of January 1968.

LM-1, encased in its SLA, being hoisted up for mounting on its launch vehicle

Lift Off at Last!
Although the launch was delayed for 10 hours when the countdown was held up by technical difficulties, Apollo 5 finally lifted off on 22 January 1968 (23 January for us here in Australia). The mission was designed to test the LM's descent and ascent propulsion systems, guidance and navigation systems, and the overall structural integrity of the craft. It also flight tested the Saturn V Instrument Unit.

Because they would not be needed during the Apollo 5 test flight, LM-1 had no landing legs, which helped to save weight. NASA also decided to replace the windows of LM-1 with aluminium plates as a precaution, after one of the windows broke during testing last December. Since the mission was of short duration, only some of LM-1’s systems were fully activated, and it only carried a partial load of consumables. 

LM-1's "legless" configuration is clearly seen in this view of it during checkout at Kennedy Space Centre

The Apollo 5 flight did not include Command and Service Modules (CSM), or a launch escape tower, so pictures of the launch vehicle show it to look more like its predecessor AS-203 than AS-202, which tested the CSM. The Apollo 5 stack had an overall height of 180ft and weighed 1,299,434 lbs. The LM was contained within the Spacecraft Lunar Module Adapter (SLA), located just below the nose cap of the rocket. The SLA consists of four panels that open like petals once the nose cap is jettisoned in orbit, allowing the LM to separate from the launcher.

The Saturn IB worked perfectly, inserting the second stage and LM into an 88-by-120-nautical-mile orbit. After the nose cone was jettisoned, LM-1 coasted for 43 minutes 52 seconds, before separating from the SLA into a 90-by-120-nautical-mile orbit. NASA’s Carnarvon tracking station in Western Australia tracked the first six orbits of the mission, while the new Apollo tracking station at Honeysuckle Creek, near Canberra, followed LM-1’s first orbit.

Putting LM-1 Through its Paces
Since it had no astronaut crew, the LM-1 test flight had a mission programmer installed, which could control the craft remotely. The first planned 39-second descent-engine burn commenced after two orbits, only to be aborted by the Apollo Guidance Computer after just four seconds, as the spacecraft was not travelling at its expected velocity. Exactly why this occurred is now being investigated. Of course, if there had been a crew onboard, the astronauts would probably have been able to analyse the situation and decide whether the engine should be restarted.

Instead, Mission Control, under Flight Director Gene Kranz, decided to conduct the engine and "fire-in-the-hole" tests under manual control, as without these test firings the mission would be deemed a failure. The "fire in the hole" test verified that the ascent stage could fire while attached to the descent stage, a procedure that will be used to launch from the Moon’s surface, or in the event of an aborted lunar landing. It involves shutting down the descent stage, switching control and power to the ascent stage, and firing the ascent engine while the two stages are still mated.

Apollo 5 Flight Director Gene Kranz (right) with future Lunar Module crew Astronauts McDivitt (left) and Schweickart (centre) discussing LM-1's control issues

Both the ascent and descent engines were fired multiple times during the flight to demonstrate that they could be restarted after initial use. Eight hours into the mission, a problem with the guidance system did cause the ascent stage to spin out of control, but the vital engine test burns had been completed by then. LM-1 also demonstrated its ability to maintain a stable hover, and the guidance and navigation systems controlled the spacecraft's attitude and velocity as planned.

At the conclusion of the flight testing, the separated ascent and descent stages were left in a low orbit, with the anticipation that atmospheric drag would naturally cause their orbits to decay so that the craft would re-enter the atmosphere. The ascent stage re-entered and was destroyed on 24 January, but as I write the descent stage is still in orbit.

Another Step on the Road to the Moon
NASA considers that the LM performed well during its test flight, and have deemed Apollo 5 a success. One wonders now if the second unmanned test flight with LM-2, planned for later this year, will need to go ahead. NASA also plans to return astronauts to space with a test flight of the redesigned Command Module in September this year. Once that goal is accomplished, every part of the Apollo system will have been tested in spaceflight and it will finally be “Go!” for astronauts to shoot for the Moon. I can’t wait!

Lunar map showing the landing sites of all the successful Surveyor missions

So Long Surveyor!
As the Apollo programme powers forward, the last of NASA’s automated lunar exploration programmes is coming to an end, with Surveyor 7 now in operation on the Moon. The Surveyor project was developed with the goal of demonstrating the feasibility of soft landings on the Moon's surface, ensuring that it would be safe for Apollo crews to touch down in their Lunar Modules. The Surveyor landings have complemented the Lunar Orbiter programme (which drew to a close in the latter part of last year), which imaged the Moon from orbit, mapping the lunar surface and providing detailed photographs of many proposed Apollo landing sites.

Making It Safe for a LM Landing
Of the seven Surveyor missions, five achieved their objectives, returning valuable data and images from the lunar surface. Surveyor 1, launched on 30 May (US time) in 1966, was the first American spacecraft to soft land on the Moon (following the successful landing of the USSR’s Luna 9 on 31 January that year), returning 11,237 images of the lunar surface. Unfortunately, its successor, Surveyor 2, failed in September 1966, impacting onto the lunar surface when a malfunction of the guidance system caused an error in the mid-course correction as it travelled to the Moon.

Surveyor 1's panorama of the lunar surface, which captured its shadow, cast by the light of the Earth

Surveyor 3, which lifted off on 17 April 1967, was the first to conduct in-situ experiments on the lunar soil, using its extendable arm and scoop. The spacecraft also returned over 6,000 images, including the famous "Surveyors Footprint" shot, showing its footpad on the lunar surface. The probe had a lucky escape as it tried to land: a problem with its descent radar caused the descent engine to cut off late, resulting in the lander bouncing twice on the lunar surface before settling down to a final safe landing!

Surveyor 3's footprint and footpad on the lunar surface, showing how it bounced on landing. The extendable arm and scoop are visible on the left of the picture

Just three months later, in July, Surveyor 4 was not so lucky. After a textbook flight to the Moon, contact was lost with the spacecraft just 2.5 minutes before touchdown in the Sinus Medii (Central Bay) region and it crashed onto the lunar surface. It’s believed that the solid-fuel descent engine may have exploded.

Launched on 8 September, Surveyor 5 also encountered engine problems on descent to the lunar surface, with a leak in the spacecraft's thruster system. Fortunately, it survived to make a safe landing and returned over 20,000 photographs over three lunar days. Instead of a sampler arm, Surveyor 5 carried an alpha backscattering experiment, and had a bar magnet attached to one landing pad. It carried out the first off-Earth soil analysis and made one of the most significant finds of the Surveyor missions — that the Moon's surface is likely basaltic, and therefore suitably safe for human exploration.

Surveyor 5's alpha backscattering experiment, sometimes described as a chemical laboratory on the Moon

Surveyor 6 landed safely near the Surveyor 4 crash site in November 1967 carrying an instrument package virtually identical to Surveyor 5. The spacecraft transmitted a total of 30,027 detailed images of the lunar surface, as well as determining the abundance of the chemical elements in the lunar soil. As an additional experiment, Surveyor 6 carried out the first lift-off from the Moon. Its engines were restarted, lifting the probe 12 ft above the lunar surface, and moving it 8 ft to the west, after which it landed again safely, and continued its scientific programme. 

Surveyor 7 – a Last Hurrah!
The successful completion of the Surveyor 6 mission accomplished all the goals that NASA had set for the Surveyor programme as an Apollo precursor. The JPL Surveyor team therefore decided that for the final mission they would aim for a riskier landing site, in the rugged highlands near the Tycho Crater. The engineers gave Surveyor 7 a less than 50-50 chance of landing upright due to the rough terrain in the area!

Tycho crater was the challenging landing site for NASA's last Surveyor mission

Launched on 7 January, Surveyor 7 is the last American robot spacecraft scheduled to land on the Moon before the Apollo astronauts. Its instrument package combines all the experiments used by its predecessors, in order to determine if the rugged terrain would be suitable for a future Apollo landing site.

During its first lunar day, the spacecraft’s camera has returned more than 14,000 images, including some views of the Earth! One of Surveyor 7’s innovations is the use of mirrors to obtain stereoscopic lunar photos. Laser beams directed at the Moon from two sites in the United States have also been recorded by cameras aboard Surveyor 7.

A view of the Earth captured by Surveyor 7's camera

Getting a Scoop
Surveyor 7’s versatile soil mechanics surface sampler is a key instrument on this mission. Designed to pick up lunar surface material, it can move samples around while being photographed, so that the properties of the lunar soil can be determined. It can also dig trenches up to 18 inches into the lunar surface to determine its bearing strength and squeeze lunar rocks or clods. The sampler is a scoop with a container which can be opened or closed by an electric motor. The scoop has a sharpened blade and includes two embedded magnets, to search for ferrous minerals and determine the magnetic characteristics of the lunar soil. So far, the moveable arm and scoop have performed 16 bearing tests, seven trenching tests, and two impact tests.

Only a few Surveyor 7 pictures are currently available, but this view of Surveyor 3 digging a trench into the Moon's surface shows how the scoop carries out this task

The scoop is mounted below the spacecraft’s the television camera so that it can reach the alpha-scattering instrument in its deployed position and move it to another selected location. In fact, the scoop helped to free the alpha-scattering instrument when it failed to deploy on the lunar surface. It has also been used to shade the alpha-scattering instrument and move it to different positions to evaluation other surface samples. During 36 hours of operation between January 11 and January 23, 1968, the sampler has performed flawlessly. Soil analyses have been conducted, as well as experiments on surface reflectivity and surface electrical properties. 

Surveyor 7 is now “sleeping” through its first lunar night. If it survives this period of intense cold, hopefully it will continue to produce significant results during its next lunar day. But if it doesn’t, the scientists and engineers at NASA’s Jet Propulsion Laboratory are already describing the Surveyor programme as a “treasure house of information for landing a man on the Moon before the end of this decade”. This has to be a fitting epitaph for any space mission.










[November 12, 1967] Still in the Race! (Apollo-4, Surveyor-6, OSO-4 and Cosmos-186-188)



by Kaye Dee

As I noted in my previous article, October was such a busy month for space activity that I had to hold over several items for this month. But November has already provided us with plenty of space news as well. Even though both American and Soviet manned spaceflight is currently on hold while the investigations into their respective accidents continue, preparations for putting astronauts and cosmonauts on the Moon are ongoing and the Moon race is still on!

“Oh, it’s terrific, the building’s shaking!”

Opening the door to human lunar exploration needs an immensely powerful booster, and the successful launch of Apollo-4 a few days ago on 9 November has demonstrated that NASA has a rocket that is up to the task. Although the Saturn 1B rocket intended to loft Apollo Earth-orbiting missions has already been tested, Apollo-4 (also designated SA-501) marked the first flight of a complete Saturn V lunar launcher.

The sheer power of the massive rocket took everyone by surprise. When Apollo-4 took off from Pad 39A at the John F. Kennedy Space Centre, the sound pressure waves it generated rattled the new Launch Control Centre, three miles from the launch pad, causing dust to fall from the ceiling onto the launch controllers’ consoles. At the nearby Press Centre, ceiling tiles fell from the roof. Reporting live from the site, Walter Cronkite described the experience: “… our building’s shaking here. Our building’s shaking! Oh, it’s terrific, the building’s shaking! This big blast window is shaking! We’re holding it with our hands! Look at that rocket go into the clouds at 3000 feet! … You can see it… you can see it… oh the roar is terrific!”

Firing Room 1 in the Launch Control Centre at Kennedy Space Centre, under construction in early 1966. The Apollo-4 launch was controlled from here

Could it be that the sound of a Saturn V launch is one of the loudest noises, natural or artificial, ever heard by human beings? (Apart, perhaps, from the explosion of an atomic bomb?) I hope I’ll get the opportunity to hear, and see, a Saturn V launch for myself at some point in the future.

The Power for the Glory

Developed by Dr. Wernher von Braun’s team at NASA’s George C. Marshall Space Flight Centre, everything about the Saturn V is impressive. The 363-foot vehicle weighs 3,000-tons and the thrust of its first-stage motors alone is 71 million pounds! No wonder it rattled buildings miles away at liftoff!

The F-1 rocket motor, five of which power the Saturn V’s S1-C first stage, is the most powerful single combustion chamber liquid-propellant rocket engine so far developed (at least as far as we know, since whatever vehicle the USSR is developing for its lunar program could have even more powerful motors).

The launcher consists of three stages. The Boeing-built S1-C first stage, when fully fuelled with RP-1 kerosene and liquid oxygen, has a total mass of 4,881,000 pounds. Its five F-1 engines are arranged so that the four outer engines are gimballed, enabling them to turn so they can steer the rocket, while the fifth is fixed in position in the centre. Constructed by North American Aviation and weighing 1,060,000 pounds, the S-II second stage has five Rocketdyne-built cryogenic J-2 engines, powered by liquid hydrogen and liquid oxygen. They are arranged in a similar manner to the first stage engines, and also used for steering. The Saturn V’s S-IVB third stage has been built by the Douglas Aircraft Company and has a single J-2 engine using the same cryogenic fuel as the second stage. Fully fuelled, it weighs approximately 262,000 pounds. Guidance and telemetry systems for the rocket are contained within an instrument unit located on top of the third stage.

Soaring into the Future

This first Saturn V test flight has been tremendously important to the ultimate success of the Apollo programme, marking several necessary first steps: the first launch from Complex 39 at Cape Kennedy, built especially for Apollo; the first flight of the complete Apollo/Saturn V space vehicle; and the first test of Apollo Command Module’s performance re-entering the Earth's atmosphere at a velocity approximating that expected when returning from a lunar mission. In addition, the flight enabled testing of many modifications made to the Command Module in the wake of the January fire. This included the functioning of the thermal seals used in the new quick-release spacecraft hatch design.

 
Up, Up and Away!

Apollo-4 lifted off on schedule at 7am US Eastern time. Just 12 minutes later it successfully placed a Command and Service Module (CSM), weighing a record 278,885 pounds, into orbit 115 miles above the Earth. This is equivalent to the parking orbit that will be used during lunar missions to check out the spacecraft before it embarks for the Moon.

After two orbits, the third stage engine was re-ignited (itself another space first) to simulate the trans-lunar injection burn that will be used to send Apollo missions on their way to the Moon. This sent the spacecraft into an elliptical orbit with an apogee of 10,700 miles. Shortly afterwards, the CSM separated from the S-IVB stage and, after passing apogee, the Service Module engine was fired for 281 seconds to increase the re-entry speed to 36,639 feet per second, bringing the CSM into conditions simulating a return from the Moon.


An image of the Earth taken from an automatic camera on the Apollo-4 Command Module

After a successful re-entry, the Command Module splashed down approximately 10 miles from its target landing site in the North Pacific Ocean and was recovered by the aircraft carrier USS Bennington. The mission lasted just eight hours 36 minutes and 54 seconds (four minutes six seconds ahead of schedule!), but it successfully demonstrated all the major components of an Apollo mission, apart from the Lunar Module (which is still in development) that will make the actual landing on the Moon’s surface. In a special message of congratulations to the NASA team, President Johnson said the flight “symbolises the power this nation is harnessing for the peaceful exploration of space”.

Goodbye Lunar Orbiters…

While Apollo’s chariot was readied for its first test flight, NASA has continued its unmanned exploration of the Moon, to ensure a safe landing for the astronauts. In August, Gideon gave us an excellent summary of NASA’s Lunar Orbiter programme, the first three missions of which were designed to study potential Apollo landing sites. Lunar Orbiter-3, launched back in February this year, met its fate last month when the spacecraft was intentionally crashed into the lunar surface on 9 October. Despite the failure of its imaging system in March, Lunar Orbiter-3 was tracked from Earth for several months for lunar geodesy research and communication experiments. On 30 August, commands were sent to the spacecraft to circularise its orbit to 99 miles in order to simulate an Apollo trajectory.

Lunar Orbiter-3 image of the Moon's far side, showing the crater Tsiolkovski

Each Lunar Orbiter mission has been de-orbited so that it will not become a navigation hazard to future manned Apollo spacecraft. Consequently, before its manoeuvring thrusters were depleted, Lunar Orbiter 3 was commanded on 9 October to impact on the Moon, hitting the lunar surface at 14 degrees 36 minutes North latitude and 91 degrees 42 minutes West longitude. Co-incidentally, Lunar Orbiter-4, which failed back in July and could not be controlled, decayed naturally from orbit and impacted on the Moon on 6 October. Lunar Orbiter-5, launched in August, remains in orbit.

…Hello Surveyor 6

A month after the demise of the Lunar Orbiters, NASA’s Surveyor-6 probe has made a much softer landing on the lunar surface, achieving a “spot on” touchdown in the rugged Sinus Medii (Central Bay – it’s in the centre of the Moon's visible hemisphere) on 10 November (Australian time; 9 November in the US). This region is a potential site for the first Apollo landing, but since it appeared to be cratered and rocky, mission planners needed to know if its geological structure (different to the ‘plains’ areas where earlier Surveyor missions have landed) could support the weight of a manned Lunar Module.

Only an hour after landing safely, Surveyor-6 was operational and sent back pictures of a lunar cliff about a mile from its landing point, which has been described as “the most rugged feature we have yet seen on the Moon”. The first panoramas from Surveyor indicate that the landing site is not as rough as anticipated, and seems suitable for an Apollo landing.

Deep Space Network stations in Australia are helping to support the Surveyor-6 mission, as well as Surveyor-5, that landed in the Mare Tranquilitatis (Sea of Tranquillity) in September and is still operational. Hopefully both spacecraft will survive the next lunar night, commencing two weeks from now. NASA plans to send one more Surveyor probe to the Moon, in January, so look out for a review of the completed Surveyor programme early next year.

Watching the Sun for Astronaut Safety

With the Sun moving towards its maximum activity late next year or early in 1969, and likely to still be very active when the Apollo landing missions are occurring (assuming that the programme resumes some time within the next 12 months), NASA has wasted no time in launching another spacecraft in its Orbiting Solar Observatory (OSO) series, to help characterise the effects of solar activity in deep space. A NASA spokesman was recently quoted as saying that “A study of solar activity and its effect on Earth, aside from basic scientific interest, is necessary for a greater understanding of the space environment prior to manned flights to the Moon”.

OSO-4 under construction

Launched on 18 October, OSO-4 (also known as OSO-D) is the latest satellite developed under the leadership of Dr. Nancy Grace Roman, NASA’s first female executive, who is Chief of Astronomy and Solar Physics. The satellite is equipped to measure the direction and intensity of Ultraviolet, X-ray and Gamma radiation, not just from the Sun, but across the entire celestial sphere.

The OSO-4 spacecraft, like its predecessors, consists of a solar-cell covered “sail” section and a “wheel” section that spins about an axis perpendicular to the pointing direction of the sail. The sail carries a 75 pound payload of two instruments that are kept pointing on the centre of the Sun. The wheel carries a 100 pound payload of seven instruments and rotates once every two seconds. This rotation enables the instruments to scan the solar disc and atmosphere as well as other parts of the galaxy. The satellite’s extended arms give it greater axial stability.

Hopefully, OSO-4 will have a long lifespan, producing data as solar activity increases across the Sun’s cycle, and enhancing safety for the Apollo and Soviet crews who will venture beyond the protection of the van Allen belts on their way to the Moon.

What are the Soviets Up To?

The USSR has been remarkably quiet about its manned lunar programme. One could almost think that they had given up racing Apollo to the Moon, if not for the rumours and hints that constantly swirl around. Rumours abounded at the time of the tragically lost Soyuz-1 mission that it was intended to be a space spectacular, debuting in the Soyuz a new, much larger spacecraft which would participate in multiple rendezvous and docking manoeuvres, and possibly even crew transfers, with one or more other manned spacecraft.

Such a space feat has yet to occur, but the mysterious recent space missions of Cosmos-186 and 188 suggest that the Soviets have something of the sort in mind for the future, and are still quietly working to develop the techniques that they will need for lunar landing missions and/or a space station programme.

It Takes Two to Rendezvous

On 27 October, Cosmos-186 was launched into a low Earth orbit, with a perigee of 129 miles and an apogee of 146 miles and an orbital period of 88.7 minutes. Cosmos-187 was launched the following day, and there has been speculation that it was intended to be part of a rendezvous and docking demonstration with Cosmos-186 but was placed into an incorrect orbit. However, as is so often the case with Cosmos satellites, the Soviet authorities only described their missions as continuing studies of outer space and testing new systems, so the actual purpose of this mission remains a mystery.


A rare Soviet illustration of what is believed to be the Cosmos-186-188 docking

However, Cosmos-186 was joined by a companion on 30 October, when Cosmos-188 was placed into a very similar orbit with a separation of just 15 miles. This clearly demonstrates the precision with which the USSR can insert satellites into orbit. The two spacecraft then proceeded to perform the first fully automated space docking (unlike the manual dockings performed by Gemini missions from Gemini-8 onwards), just an hour after Cosmos-188 was launched. Soviet sources, and some electronic eavesdropping by the now-famous science class at Kettering Grammar School in England, using surprisingly unsophisticated equipment, indicate that Cosmos-186 was the ‘active’ partner in the docking. It used its onboard radar system to locate, approach and dock with the ‘passive’ Cosmos-188.

While the two spacecraft were mechanically docked, it seems that an electrical connection could not be made between them, and no other manoeuvres appear to have been carried out while Cosmos-186 and 188 were joined together. Perhaps there were technical issues surrounding the docking, but an onboard camera on Cosmos-186 did provide live (if rather low quality) television images of the rendezvous docking and separation, and some footage was publicly broadcast.

After three and a half hours docked together, the two satellites separated on command from the ground and continued to operate separately in orbit. Cosmos-186 made a soft-landing return to Earth on 31 October, lending credence to the speculations that it was testing out improvements to the Soyuz parachute system, while Cosmos-188 reportedly soft-landed on 2 November.

Speculating on Soviet Space Plans

Was Cosmos-186 a Soyuz-type vehicle, possibly testing out modifications made to prevent a recurrence of the re-entry parachute tangling that apparently led to the loss of Soyuz-1 and the death of Cosmonaut Komarov? Building on speculations from the time of the Soyuz-1 launch, there have even been suggestions that Cosmos-186, while unmanned, was a spacecraft large enough to hold a crew of five cosmonauts. There is also speculation that Cosmos-188 may have been the prototype of a new propulsion system for orbital operations. Does this mean, then, that the USSR is planning some kind of manned spaceflight feat in orbit to celebrate the 50th anniversary of the Communist Revolution? Or that it will soon attempt a circumlunar flight, to reach the Moon ahead of the United States?

Whatever their future plans may be, the automated rendezvous and docking of two unmanned spacecraft in Earth orbit shows that the USSR’s space technology is still advancing rapidly. The joint Cosmos 186-188 mission proves that it is possible to launch small components and assemble them in space to make a larger structure, even without the assistance of astronauts. This means that massive rockets like the Saturn V might not be required to construct space stations in orbit, or even undertake lunar missions, if the project is designed around assembling the lunar spacecraft in Earth orbit. Has the Cosmos 186-188 mission therefore been a hint of what the USSR's Moon programme will look like, in contrast to Apollo? Only time will tell…